D2.1 Definition of stakeholder requirements, market demands and application challenges
D2.2 Definition of system context and limits for use
D2.3 Analysis of relevant legislation and standards for system application
D2.4 System characterization and operational parameters
D2.5 Safety and maintenance report
D3.1 Initial dimensioning of the system according to general use typologies
D3.3 Installation strategies of peripheral thermal equipment
D3.5 Installation strategies of improved PVT electrical generation system
D3.9 Installation strategies of the electrical storage system
D3.10 Module to represent the system in whole building energy modelling packages
D4.1 Numerical optimization of the reactive salt compound and vessel
D4.2 Design of the hot and cold PCM materials and their vessels
D4.3 Design of ancillary equipment for TCM reactor and PCM storage
D4.5 Report on the manufacture and preliminary tests of TCM and PCM units
D4.6 Safety assessment for NH3 handling in the system
D5.2 Detailed design of the Energy Management System
D5.3 Design of the forecasting modes
D5.4 Initial design of the IoT platform for user interaction
D5.5 Detailed design of the IoT platform for user interaction
D6.1 Design of the monitoring system and KPI definition
D6.2 Results from functional and quality acceptance tests
D6.3 Results from pre-pilot implementation and stakeholder training
D6.4 Installation and commissioning report
D6.5 Initial report on KPI measurement and analysis
D6.6 Second report on KPI measurement and analysis
D6.7 Feasibility analysis for installation replication across Europe
D7.1 Design evaluation through user validation in pre-demonstration site
D7.2 Design evaluation through user validation in demonstration sites
D7.3 Environmental and life-cycle assessment
D7.9 System application methodology, protocols and installation guide
D7.10 Final Plan for Exploitation and Dissemination of Project Results (PEDR)
D8.1 First version of the communication and dissemination plan
D8.2 Detailed version of the communication and dissemination plan